
By Newswire Editorial
Construction work on the road connecting the New Kelani Bridge and the Colombo Port Access Elevated Highway has commenced, with the project expected to significantly reduce travel time into Colombo.
During an interview with Ahasa News, Project Director of the Port Access Elevated Highway Project, Supun Abeywickrama, said the 5.2-kilometre elevated highway would enable motorists to cover the distance in approximately five to six minutes.
He pointed out that motorists travelling along Baseline Road during peak traffic hours currently take 40 minutes or more to enter Colombo.
Abeywickrama said the second phase of the project would provide motorists with access to the Colombo Port, while plans are underway to extend the road to Galle Face.
He said construction of the elevated highway up to the Colombo Port has been completed, with construction of the next section connecting the port to Galle Face expected to commence soon.
Once completed, the road is expected to be opened for public use, enabling motorists travelling from the Katunayake Airport via the expressway to gain direct access to the heart of Colombo. (Newswire)

